Case Study

Enhancing Planning and Scheduling for a Defense Manufacturing Client in the US

A leading heavy-duty forklift OEM moved first contact onto AI agents. Coverage went round the clock, urgent work was separated from routine at the door, and the simple calls stopped reaching technicians at all.

Engagement at a glance
Client
US defence manufacturer - weapon systems, parts, ammunition
Industry
Defence manufacturing
Solution
iPLAN advanced planning, powered by Ortems
Built for
Real-time production visibility and predictive maintenance
The shift
Scheduling by spreadsheet replaced by live machine-level plans
Opportunity for impact

Three numbers the service desk moved.

Measured against the client's own pre-deployment baseline across the nationwide dealer and parts network.

27%

Reduction in lead time

Routine fault and parts questions closed by the agent, never entering the human queue.

29%

Decrease in downtime

Guided diagnostics run at the moment of the call instead of waiting on technician availability.

4x

Faster Delivery

Visits booked against real technician availability, then confirmed automatically.

About the client

A US defense manufacturer planning without a view of the floor.

A leading US-based defense manufacturer specializing in the design, development, and production of advanced weapon systems, missile parts, and ammunition. To overcome challenges like limited production visibility, inefficient resource planning, and machine underutilization, ITHENA implemented an Advanced Planning Solution, powered by Ortems. With real-time production tracking, optimized resource utilization, predictive maintenance, and enhanced compliance, the company achieved greater efficiency, faster delivery, and improved operational agility.

In their words
ITHENA’s expertise and the Ortems solution have transformed our production operations. We now have real-time visibility, optimized scheduling, and the agility to respond quickly to changing demands, driving significant improvements in efficiency and delivery.

Director, Operations
Key challenges faced

Gaps between a breakdown and an answer.

  • Limited visibility in production scheduling causing frequent delays
  • Inefficient planning and resource allocation resulting in high lead times
  • Production bottlenecks leading to machine underutilization
Our solution

ITHENA gave the planners a live view of production with:

Real-Time Production Visibility

Integrated Ortems with existing systems for seamless data flow and schedule tracking

Optimized Resource Utilization

Configured advanced scheduling algorithms to minimize idle time and maximize machine efficiency

Predictive Maintenance Scheduling

Enabled proactive maintenance to prevent unexpected failures and respond quickly to order changes

Improved Supply Chain Coordination

Provided just-in-time inventory management and improved material flow

Enhanced Compliance & Quality

Automated tracking for audits, quality control, and regulatory adherence

Put agents on your service desk.

Tell us your call volume, your after-hours gap and the systems your technicians already work in, and we'll show you what the first 90 days look like.

Please fill in the details below:

Case Study PDF form

Please fill in the details below:

Case Study Help Enquiry

Please fill in the details below:

Case Study PDF form

Please fill in the details below:

Case Study Help Enquiry