Manufacturing planning and scheduling

Manufacturing Planning & Scheduling

Helping manufacturers plan production on real capacity, so the dates they promise are dates the shop can keep.

  • Production planningProjects, jobs and operations in one plan with your ERP.
  • Finite-capacity schedulingWork centers, crews and equipment scheduled on real capacity.
  • Capacity and delivery datesLoad, bottlenecks and delivery promises from the plan.
  • Shop-floor reportingOperators report progress so the plan reflects production.
See our services

The challenge

Why promised dates slip on the shop floor

Plants plan in too many places, and none of them holds the whole date.

  1. 01

    Planning in too many places

    Quotes, drawings, the shop schedule and the ERP each hold part of the date, and none of them holds all of it, so the floor is surprised by a late drawing.

  2. 02

    Dates promised against infinite capacity

    The schedule assumes the work center is free and the crew is available, and the test bay is already full when the job gets there.

  3. 03

    The ERP out of step with the plan

    Orders are re-typed, promised dates never go back to the ERP, and a changed or deleted line never reaches production.

Services

From order to a date the shop keeps

Planning and scheduling services for a single plant or a network of plants. Our services include:

  1. 01Assessment of how production is planned and scheduled today
  2. 02Implementation of production planning and finite-capacity scheduling
  3. 03Integration with your ERP, so orders come in and promised dates go back
  4. 04Capacity planning and delivery-date promising from the plan
  5. 05Shop-floor reporting so operators update the plan as work is done
  6. 06Multi-plant rollouts and training for planners, supervisors and operators

Outcomes

What changes when the plant works to one plan

Dates you can promise, and a shop that builds to them.

  • 01

    A schedule the shop can build

    Every job planned on real work centers, crews and calendars.

  • 02

    Delivery dates answered in seconds

    When can you ship, answered from the plan, with what holds the date back.

  • 03

    Bottlenecks seen before they hit

    Load by work center and by person shows the coming constraint early.

  • 04

    Progress as it happens

    Operators report work done, so the plan and the project see production move.

  • 05

    The ERP and the plan in step

    Orders come in from the ERP and promised dates go back to it.

  • 06

    Margin known while it can change

    Budget, actual and forecast on every project, flagged when the margin drops.

Approach

How we deploy planning across plants

We utilize a holistic approach to ensure seamless deployment and integration of planning and scheduling applications across enterprises.

  1. 01

    Business understanding

    How orders, capacity and promised dates move through the plant today.

  2. 02

    Requirement elicitation

    The planning rules, constraints and ERP links the schedule has to respect.

  3. 03

    Design thinking

    Shape the plan model around your work centers, crews and calendars.

  4. 04

    Workshop

    Planner workshops that close the gaps before the first live schedule.

  5. 05

    Deployment

    Go live plant by plant, with planners and operators trained on it.

Why planning and scheduling

One plan on real capacity

Planning decides what to make and when. Scheduling decides where and by whom, on the capacity the plant really has.

When the two live apart, the plan is right on paper and wrong on the floor. ITHENA brings planning, scheduling and the ERP together so the whole plant works to one plan.

Technology partners

Built on proven platforms

Nine technology partners we integrate with to reduce risk and speed delivery.

Get started

Promise dates the shop can keep

Tell us how you plan production today and we will assess where one plan on real capacity closes the gaps.

New - B2B eCommerce Form