Blog

Manufacturing Quoting Software for Custom Machines

Learn how to prepare a useful early estimate before every machine part is specified, and keep assumptions, approvals, and revisions visible as engineering progresses.

By ITHENA ITHENA Insights 5 min read

FAQ

Questions people ask about manufacturing quoting software

Short answers on estimating custom machines before the final parts list is ready.

Can I quote a custom machine before the BOM is complete?

Yes. Prepare a budgetary estimate from an agreed scope, comparable project history, and clear assumptions. Explain what could change the price, and distinguish the estimate from a firm quote.

What information should an early machine quote include?

Capture required output, cycle time, product range, environment, utilities, site constraints, safety requirements, equipment interfaces, and installation needs. Mark what is confirmed and what remains open

How should I handle parts that are not specified yet?

Use a named allowance or supplier budget input, document its basis, assign an owner, and set a date to confirm it. Do not present an unknown cost as a validated supplier price

What should manufacturing quoting software track?

Look for quote versions, source documents, assumptions, exclusions, approvals, supplier inputs, and the handoff to engineering and production

How is an early estimate different from a firm quote?

An early estimate is based on developing information and disclosed assumptions. A firm quote should have an approved scope, validated costs, delivery basis, commercial terms, and clear change conditions.

How do I compare quoting and CPQ tools?

Demonstrate your real workflow. Compare incomplete information handling, estimate revisions, approvals, supplier input, pricing, and transfer into the systems used by engineering and operations.

Key takeaways

The short version

  • Define the decision and machine scope before calculating a price.
  • Separate confirmed information, assumptions, allowances, exclusions, and open questions.
  • Revise the estimate at design milestones and use actual costs to improve future estimates.

Define the estimate

Set a clear scope before pricing

An early estimate helps the buyer decide whether to continue and helps the builder plan engineering. It is useful only when the scope and maturity of the price are clear.

An early machine quote is prepared while engineering is still defining the equipment and the final bill of materials (BOM) is incomplete. State what is known, assumed, excluded, and still needed before the price can be firm.

Ask what decision the estimate must support. A concept estimate for budget planning needs a different level of detail from a quote used to place an order. Define what the builder will supply: base machine, guarding, controls, installation, training, or commissioning. List customer supplied equipment and site work separately.

For engineer-to-order projects, preliminary requirements can precede the final BOM transfer. SAP’s engineer-to-order example illustrates why the early request and later engineering detail should remain traceable.

A clear scope lets the customer and builder understand what an early estimate includes.

Make assumptions visible

Build the estimate from known information

Group costs, compare against similar completed projects, and make unresolved choices explicit instead of waiting for every part number.

Divide the machine into cost groups such as engineering, controls, purchased equipment, fabricated parts, assembly, testing, installation, freight, and commissioning. Use completed projects as a starting point only when their scope is comparable. Adjust for measurable differences such as throughput, station count, product dimensions, motion axes, safety needs, and integration work.

For each line, record its basis and whether it is confirmed, assumed, allowed for, excluded, or awaiting a decision. Ask suppliers for budget inputs on items that could dominate cost or lead time. Keep confirmed supplier prices separate from estimates, and assign each allowance an owner and a date for confirmation.

For example, an inspection machine may have a confirmed target rate and product size but open camera selection, line connection, and installation location. Show how those decisions could affect equipment, controls, travel, or commissioning without inventing a precise cost for unknown work.

The US Government Accountability Office estimating guide recommends documenting assumptions, examining how changes affect an estimate, and updating it as the plan changes. It is written for government programs; apply it here as general estimating discipline, not as a manufacturing rule.

Custom machine estimate
An explicit estimate basis helps reviewers see which decisions could change price or timing

Control revisions and handoffs

Choose software around the next workflow

Use quote revisions to reflect design changes, then evaluate software by how it carries approved information into engineering and production

Give every estimate a revision, date, scope, and approval state. When a requirement changes, record what changed and why the price or schedule moved. Set review points at concept approval, design review, supplier validation, and release for production. Replace assumptions with confirmed information where possible, then compare estimates with actual labor and material costs after delivery.

Some tools estimate parts from drawings or CAD. Others support configurable products, proposals, or the handoff from an approved order into engineering and production. A custom machine builder may need more than one approach. Compare how each tool handles incomplete information, quote history, approvals, supplier input, and transfer to operations.

Review ITHENA’s industrial CPQ software and manufacturing ERP information for published capabilities. The PanelOps manufacturing workflow article covers adjacent quote to production topics. Ask the team to demonstrate your own quote before the BOM is complete; published pages do not confirm every preliminary estimate scenario.

“Pick the process that hurts most.”

ITHENA

What comes next

Turn the estimate into a controlled quote

Refine project estimates using validated data

As the design matures, replace allowances with approved engineering and supplier information. Before releasing a firm quote, confirm scope, cost basis, delivery assumptions, quote validity, and change conditions. After delivery, feed actual costs back into future estimates.

About

The platform and the company

ITHENA iCRM CPQ

ITHENA describes industrial CRM and configure price quote capabilities for OEMs and system integrators. Compare the published workflow with your own needs for pricing, quote revision, approvals, and order handoff.

ithena.ai/crm-cpq

ITHENA

A nimble technology company delivering persona-based AI solutions to manufacturing, life sciences, services and government, helping customers monetise their digital investments by making AI practical.

ithena.ai

Get started

Connect one line. See the deviation before it becomes downtime.

Start with one line on your own data and expand use case by use case.