Hybrid manufacturing

Process to packaging, connected in one view.

You make in kilograms and sell in units. Most plants run those two halves on separate systems.

ITHENA connects the conches, tempering machines, moulding lines and wrappers you already run: each batch and packaging line live, drift caught before it reaches thousands of bars.

ithena · hybrid manufacturing
Hybrid manufacturing challenges

One weak handoff. Two plants out of step.

In hybrid manufacturing, the batch side and the packaging side depend on each other minute by minute. Yet many manufacturers see a problem only after it has crossed from one side to the other.

01

A packaging stop backs up the process

When a wrapper or moulding line stops, tempered chocolate has nowhere to go. Buffer tanks fill, hold times run out and the next batch waits. When the batch runs late, the packaging lines starve.

02

A drifting batch becomes thousands of bad units

Temper, viscosity or moisture drifting from the recipe shows up later as bloom, underweight bars, overfill giveaway and rework, long after the batch has been moulded and wrapped.

03

Traceability breaks where kilograms become units

Ingredient lots and batch records sit in one system, pallets and cases in another. Linking a finished pallet back to its batch, rework and ingredient lots takes days of paper and spreadsheets.

The ITHENA platform

Process and packaging on one practical AI layer.

Batch monitoring, packaging line OEE, predictive maintenance, golden-batch analytics and batch-to-pallet traceability, working from one record for every unit, line and batch.

Layer 1Continuous improvement
iGEMBA

Run one morning meeting for both halves

Shift handover, operator rounds and the morning meeting run on iGEMBA. The making and packing teams see the same safety, quality, delivery and people board, with batches on hold, line stops and changeovers from the last 24 hours.

  • Operator rounds and shift handover, making and packing
  • Morning meeting with batch, line and changeover status
  • Actions with an owner and a due date
Explore iGEMBA
ITHENA iGEMBA board for a plant: safety, delivery, people and quality for the month, one cell per day.
Layer 2Plant operations, four tools on one record for every unit, line and batch
  1. Top-down view of moulded chocolate bars moving down the line.
    Module 01

    Production Monitoring

    Batch progress and packaging line OEE in the same view.

    • Batch cycle time and yield vs. standard
    • Line OEE, speed and stops by cause
    • Buffer levels, changeover and cleaning time
    Explore Production Monitoring
  2. A technician in a hairnet works the control panel of a chocolate melting machine.
    Module 02

    CMMS | Maintenance

    Conches, tempering machines, pumps, moulding lines and wrappers on one asset record.

    • Condition and run-hour triggers
    • Predictive work orders, planned around changeovers
    • Checklists and sign-off on a phone
    Explore CMMS
  3. Close-up of filled chocolates lined up on the production line for inspection.
    Module 03

    Quality Management

    Lab, in-process and line checks attached to every batch and pallet.

    • Golden-batch comparison and live SPC
    • Weight control and giveaway by line
    • Ingredient lot to batch to pallet genealogy
    Explore Quality Management
  4. Close-up of valves and pipework on a plant utility line.
    Module 04

    Energy & Utilities

    Steam, chilled water, compressed air and power metered per unit and line.

    • Energy per batch and per tonne packed
    • Cooling tunnel and chiller load
    • Air leaks, power quality and peak demand
    Explore Energy Management
Layer 3Practical AI across all four tools
FactoryGPT

Ask about any batch or line in plain words

FactoryGPT sits behind the four tools and the iGEMBA board. It answers questions that cross the batch-to-pack boundary, using data from all of them, and cites every source.

Explore FactoryGPT
FactoryGPTReading Batch · Line · CMMS · Quality · Energy
Live
Which pallets contain chocolate from batch 2314?

Batch 2314 (dark 70%) was moulded on Line 2 and packed onto 6 pallets: 4 shipped, 2 still in the warehouse.

  • P-88412 to 15Shipped · DC North4 pallets
  • P-88416Warehouse · Bay 7In stock
  • P-88417Warehouse · Bay 7In stock
Batch record B-2314Line 2 pack logWarehouse
Why did Line 2 give away more weight on the night shift?

Night shift gave away 2.8 g per bar against 1.1 g on days. The checkweigher target was raised after a reject alarm at 23:10 and never reset.

  • Day1.1 g
  • Evening1.3 g
  • Night2.8 g
Checkweigher CW-2Shift logSPC
How long did the last three changeovers take, and why?

Two of the last three ran over the 45 min standard. Milk to dark lost 27 min to an extra wash on the tempering unit.

  • Milk → Dark72 min
  • Dark → Hazelnut48 min
  • Hazelnut → Milk45 min
Line 2 eventsCMMS WO-3381Materials log
How it starts

One batch-to-pack line, then the whole site.

Start with the line where making and packing fall out of step most often. We connect it end to end, you watch it live, and each next tool turns on without a second login.

  1. 01

    Connect one line end to end

    Batch controls, historian and the packaging machines on one product line.

  2. 02

    Watch it live

    Batch progress, buffer levels, line speed and stops from the first shift.

  3. 03

    Switch on the next tool

    CMMS, quality or energy, linked to the same asset and batch record.

  4. 04

    Roll out across plants

    iGEMBA boards and FactoryGPT across all lines and sites.

Success story

How a food plant dropped paper checklists.

A large confectionery and snacks maker moved its maintenance checklists, PM schedules and service tickets into ITHENA, so every check is recorded and traceable.

Read the full case study
31%
higher maintenance compliance and traceability
32%
less equipment downtime
25%
higher maintenance efficiency
Technology partners

Practical AI, built on proven platforms.

Eleven technology partners, to reduce risk and speed delivery.

Get started

Let’s start with one of your lines, batch to pack.

Pick the product line where making and packing fall out of step. We connect it end to end, show it live with your own plant in it, and build from there.

  • Production Monitoring
  • CMMS
  • Quality
  • Energy & Utilities
New - B2B eCommerce Form