Enhancing Planning and Scheduling for a Defense Manufacturing Client in the US
A leading heavy-duty forklift OEM moved first contact onto AI agents. Coverage went round the clock, urgent work was separated from routine at the door, and the simple calls stopped reaching technicians at all.
- Client
- US defence manufacturer - weapon systems, parts, ammunition
- Industry
- Defence manufacturing
- Solution
- iPLAN advanced planning, powered by Ortems
- Built for
- Real-time production visibility and predictive maintenance
- The shift
- Scheduling by spreadsheet replaced by live machine-level plans
Three numbers the service desk moved.
Measured against the client's own pre-deployment baseline across the nationwide dealer and parts network.
Reduction in lead time
Routine fault and parts questions closed by the agent, never entering the human queue.
Decrease in downtime
Guided diagnostics run at the moment of the call instead of waiting on technician availability.
Faster Delivery
Visits booked against real technician availability, then confirmed automatically.
A US defense manufacturer planning without a view of the floor.
A leading US-based defense manufacturer specializing in the design, development, and production of advanced weapon systems, missile parts, and ammunition. To overcome challenges like limited production visibility, inefficient resource planning, and machine underutilization, ITHENA implemented an Advanced Planning Solution, powered by Ortems. With real-time production tracking, optimized resource utilization, predictive maintenance, and enhanced compliance, the company achieved greater efficiency, faster delivery, and improved operational agility.
ITHENA’s expertise and the Ortems solution have transformed our production operations. We now have real-time visibility, optimized scheduling, and the agility to respond quickly to changing demands, driving significant improvements in efficiency and delivery.
Director, Operations
Gaps between a breakdown and an answer.
- Limited visibility in production scheduling causing frequent delays
- Inefficient planning and resource allocation resulting in high lead times
- Production bottlenecks leading to machine underutilization
ITHENA gave the planners a live view of production with:
Real-Time Production Visibility
Integrated Ortems with existing systems for seamless data flow and schedule tracking
Optimized Resource Utilization
Configured advanced scheduling algorithms to minimize idle time and maximize machine efficiency
Predictive Maintenance Scheduling
Enabled proactive maintenance to prevent unexpected failures and respond quickly to order changes
Improved Supply Chain Coordination
Provided just-in-time inventory management and improved material flow
Enhanced Compliance & Quality
Automated tracking for audits, quality control, and regulatory adherence