A machine stops. The repair may be straightforward. Getting ready to make that repair can take much longer.
Someone needs to identify the fault, check what happened last time, find the right procedure and confirm whether the replacement part is available. Every delay extends the interruption.
What $125,000 an hour actually measures
ABB asked 3,215 plant maintenance decision makers what an hour of unplanned downtime costs them. The typical answer was close to $125,000 per hour. Read ABB's survey release
The figure is a median based on respondents' own estimates, across sectors from energy and chemicals to food and beverage. Your cost will depend on your equipment, your output and your circumstances.
Why this matters more in 2026
Deloitte's 2026 Manufacturing Industry Outlook expects investment in smart manufacturing to keep growing through 2026, as manufacturers look for competitiveness and resilience. Its survey of 600 manufacturing executives shows where the gap is.
So the useful question is not what downtime costs in general. It is this: where could your team act sooner?
Most stops give a warning first
A bearing wears. A spindle loses efficiency. A motor runs warmer than it should. Often, hours or days before the stop, the change is already in the machine's own data: in the controller, the sensors and the quality records.
The problem is that nobody is watching it in time. Maintenance runs on the calendar, or starts once the machine has already stopped. The warning was there. It was never seen.
Fix on failure: the machine picks the moment
- DriftWear starts, nobody sees it
- StopThe line halts mid shift
- DiagnoseFind the cause under pressure
- PartWait for the replacement
- RestartLost output on top of the repair
Every step happens while the line is down.
Predicted: you pick the moment
- DriftFlagged against the machine’s normal
- CauseNamed from machine and process data
- WindowA maintenance slot is recommended
- PartOrdered while the line runs
- RepairDone in the planned window
The same work, done while the line is planned to stop.
Uptime reports hide the losses
A standard uptime report shows availability, and stops there. Take one machine on the iMEX demo line. It was switched on for 21.9 of its 24 planned hours, so the report says 91 percent and signs it off as healthy.
But it made 1,152 parts against a rated 2,400, and 230 of them were scrapped or reworked. Its overall equipment effectiveness was 35 percent. Slow running and scrap never reach the uptime report.
Four things to check in your maintenance process
Before you look at any software, look at how a warning travels through your plant today. Start with four questions.
- VisibilityCan you see each machine's condition live, or only in an end of shift report?
- Early warningDo you know when a machine drifts from its own normal, before it stops?
- CauseCan you see machine, process and quality data together, to say why it is drifting?
- TimingDo you choose the maintenance window, or does the machine choose it for you?
If any answer is "it depends who you ask", that is where your downtime grows. It is the gap predictive maintenance closes.
How iMEX predicts the stop
iMEX is ITHENA's performance monitoring and predictive maintenance platform. It connects the machines you already run and reads them on the standards they already speak: OPC UA, Modbus, MQTT, Siemens S7 and Euromap 63. A machine that publishes nothing gets a gateway on the panel instead of a replacement.
- Scores every machineOEE, availability, performance and quality, live, per machine, line and shift.
- Learns normalAn AI engine reads condition rather than the calendar, and learns what normal looks like on each machine.
- Names the causeIt flags a deviation in real time and correlates machine, process and quality data to say what caused it.
- Forecasts the failureA predicted failure zone with a risk level, a confidence and a recommended maintenance window.
- Turns it into workOne click creates the work order. The operator, plant manager and maintenance lead each see their own screen.
It starts with your asset list. One line goes live first and starts scoring against a shift you already know. Then the rest of the fleet joins, and alerts arrive as maintenance windows instead of surprises.