Discrete manufacturing

See every line and station as it runs.

A stop, a slow station or a bad part usually shows up on paper, after the shift.

ITHENA picks it up from the presses, CNC cells and assembly stations as it happens: live OEE, a work order created from the alarm, and the quality check done right at the station. So you can act while the shift is still running.

ithena · discrete manufacturing
Discrete manufacturing industry challenges

You find out a shift too late.

A spindle stops, a station runs slow, a part drifts out of tolerance. On paper boards and end-of-shift spreadsheets, you only see it when the orders are already late.

01

Breakdowns set the schedule

When a spindle or fixture fails, every job on that machine stops. The repair starts after the breakdown, and every order behind it runs late.

02

The floor runs on clipboards

Parts made, scrap and stop reasons are written down and typed into a spreadsheet after the shift. By then the OEE is a day old and nobody fully trusts it.

03

Problems surface at final inspection

Leaders walk the floor with yesterday’s numbers. Check sheets sit in a binder. A part that drifted out of tolerance is only caught at final inspection, after the whole batch is made.

How ITHENA solves it

Continuous Improvement and Production Management on a Practical AI Layer, Across Your Plants.

Layer 1Continuous improvement
iGEMBA

Run the day from one board

The shift walk, the tier huddle and the follow-up actions all run on iGEMBA. Every line’s safety, delivery, people and quality sit on one live board.

  • Daily walks
  • Tier huddles
  • Actions with an owner
Explore iGEMBA
ITHENA iGEMBA board: safety, delivery, people and quality for the month, day by day in green and red
Layer 2Production management, four tools that share one asset record
  1. A blue robot arm in an automated cell on an automotive production line.
    Module 01

    Production Monitoring

    Every station measured against takt, straight from the PLC.

    • Line and station OEE, live
    • Stops grouped by cause
    • Cycle time against takt
    Explore Production Monitoring
  2. Looking into a robot cell where a yellow robot works over the conveyor.
    Module 02

    CMMS | Maintenance

    Robots, weld guns and conveyors serviced by hours or condition.

    • Predictive work orders
    • MTBF and MTTR per asset
    • Signed off on a phone
    Explore CMMS
  3. An engineer checks results on a laptop at an automotive test rig.
    Module 03

    Quality Management

    Every gate check saved against the part’s serial number.

    • Gauge and torque checks at gates
    • Live SPC on critical dimensions
    • Suspect parts traced by serial
    Explore Quality Management
  4. A painted car body moves down the line through a caged robot station.
    Module 04

    Energy Management

    Paint shop, compressed air and welding metered separately.

    • kWh per line and shop
    • Compressed air leaks at weekends
    • Energy cost per part
    Explore Energy Management
Layer 3Practical AI across all four tools
FactoryGPT

Ask any line, station or part a question

FactoryGPT sits behind all four tools. Ask a question in plain words and it answers using production, maintenance, quality and energy data together, across all your plants.

See FactoryGPT
FactoryGPTReading Production · CMMS · Quality · Energy
Live
Show me the OEE trend for Body Line 2

OEE fell from 78% to 69% in 7 days. Most of the drop is availability at Station 40, where weld robot R-12 faults on tip dress.

  • Mon78%
  • Tue77%
  • Wed76%
  • Thu74%
  • Fri72%
  • Sat69%
PLC · Body Line 2Downtime log
Top three issues this week

Three issues cost the most this week, led by tip-dress faults at Station 40.

  • 1Weld tip-dress faults · St 403.4 h
  • 2Conveyor jam · St 252.1 h
  • 3Torque NOK · Gate 346 parts
DowntimeQuality gate 3CMMS
Which station should I fix first?

Station 40. It is the bottleneck at 58 s against a 55 s takt, plus 3.4 h of stops. Fixing it is worth about 31 cars per shift.

  • St 2050 s
  • St 3052 s
  • St 4058 s
  • St 5051 s
Cycle dataTakt 55 sCMMS
Approve work order WO-5521
How it starts

One assembly line first, then every plant.

Pick the line with the most stops. We connect it, you watch it run live, and each next tool switches on without a second login.

  1. 01

    Connect one line

    PLCs, counters and the shift plan on the line that hurts most.

  2. 02

    Watch it live

    OEE, stops and cycle time by station from the first shift.

  3. 03

    Switch on the next tool

    CMMS, quality or energy on the same asset record, no new integration.

  4. 04

    Roll out across plants

    iGEMBA boards and FactoryGPT across every line and site.

Success story

How one defense plant moved off paper boards.

A US defense manufacturer replaced paper KPI tracking on its Gemba walks with ITHENA Digital Gemba. Safety, delivery, quality and cost now sit on one live board.

Read the full case study
32%
higher productivity
25%
faster decisions
29%
higher efficiency
1
live board for every line
Technology partners

Practical AI, built on proven platforms.

Eleven technology partners, to reduce risk and speed delivery.

Get started

Let’s start with one of your lines.

Pick a line and the stops that hurt most. We connect it and show you these same screens with your own line’s data in them.

  • Production Monitoring
  • CMMS
  • Quality
  • Energy
New - B2B eCommerce Form